SANYO ULT freezer 2nd stage system choking

Customer reported freezer fluctuating in temperature, on investigation by our ULT freezer engineer it was quickly diagnosed the 2nd stage refrigeration system was partially choking, removal and installation of a new filter drier on the 2nd stage refrigeration system cured the fault, freezer fully back operational and another happy customer.

Oil separator removed and replaced on 2nd stage system of Thermo -80 ult freezer

New customer asked Cryomed scientific to diagnose the intermittent fault on their Thermo -80 upright ult freezer, freezer operating at -80 on arrival but after looking at temperature graphs it was easy to diagnose the intermittent failure of the 2nd stage refrigeration systems oil separator, Post ordering a replacement oil separator our engineer removed faulty… Continue reading Oil separator removed and replaced on 2nd stage system of Thermo -80 ult freezer

Coldroom repair

Customer contacted Cryomed scientific when their +4 walk-in coldroom failed, our engineer quickly diagnosed the system to have lost all its refrigerant charge, following a pressure test of the pipework a leak was found and repaired on the expansion valve flare nut, after vacuuming the system and fully charging the system with refrigerant the customer… Continue reading Coldroom repair

VINDON Climatic chamber repair

Customer contacted Cryomed scientific when their maintenance and validation company couldn’t repair their Vindon climatic chamber, Leak and pressure test of the refrigeration system identified a leak on the suction valve once the valve was fully tightened and repaired another leak and pressure test followed, fully charging the system with refrigerant, once the system fully… Continue reading VINDON Climatic chamber repair

Panasonic -80 ULT FREEZER COMPRESSOR REPLACEMENT

Removal and replacement of 2nd stage compressor on our customers Panasonic -80 upright ULT Freezer, Repair performed on site and fully operational by the end of the day, pressure tested, leak tested and fully charged with 1st and 2nd stage refrigerants, Saves customer time and money moving freezer off site,

Panasonic -80 upright ult freezer replacement 2nd stage compressor and oil sep

Replacement of 2nd stage compressor and oil separator on our clients Panasonic -80 ult freezer, total job performed and completed on customers premises ,our competitors usually remove from site to repair costing the end user more expense to have uplifted and delivered back and to be out of use for weeks instead of days,

Eppendorf cooled centrifuge repair

IMG_0538 Customer reported Eppendorf cooled centrifuge not cooling, Identified leak on system, repaired on site, fully charged system with refrigerant and oil leaking the centrifuge fully operational on the first visit