Thermo scientific replacement ultra pure filter on our clients laboratory water purification system

Water pump repair to Elga ring main water purification system

University customer called Cryomed scientific when their Elga water purification ring main system stopped filling the reservoir tank and the system was leaking, Within an hour our engineer had removed the pump , repaired the leak and freed the seized pump, system back fully operation with minimum downtime for our client

Avidity water system repair

Customer called Cryomed scientific when the manufacturer was unable to locate and repair water leak on the pure water system, within the hour our engineer located and replaced leaking part, System back fully operational and customer has asked for quotation to contract Cryomed scientific with all their water purification systems.

Fisher Accu20 annual service

Nottingham university invited Cryomed to service their Fisher Accu20 water purification system, replaced all consumables and flushed system through, left system fully operational with water quality at 18.2 m/ohms